Resource distribution method for throughput maximization in cooperative cognitive SIMO network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9137784
SERIAL NO

13520175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resource distribution method for throughput maximization in a cooperative cognitive SIMO network. The primary user sends data after receiving a cooperation confirmation message, and the cognitive network keeps silent, receives the information data of the primary user and simultaneously decodes the data. The cognitive users which successfully decode the data send the data of themselves to the cognitive base station and forward the data of the primary user; the cognitive users which cannot successfully decode the data only send the data of themselves and do not forward the data of the primary user. The cognitive base station eliminates the interference of the data of primary user and performs beamforming for the signals. According to the combined adjustment the maximum throughput performance can be realized in the cognitive network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PLA UNIVERSITY OF SCIENCE AND TECHNOLOGY210007 NO 88 CAMP ROAD NANJING JIANGSU NANJING CITY JIANGSU PROVINCE 210007

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Jinlong Jiangsu, CN 21 38
Wu, Qihui Jiangsu, CN 13 5
Yang, Yang Jiangsu, CN 1214 8701
Zhang, Yuming Jiangsu, CN 45 756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00