Source code separation and generation for heterogeneous central processing unit (CPU) computational devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9134974
APP PUB NO 20140149969A1
SERIAL NO

13998578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example method includes obtaining annotated source code and based at least in part on a first annotation, separating the source code into first and second source code portions. The method also includes generating from the first source code portion a first source code stream to be supplied for compilation by a first compiler, the first source code stream augmented, based on the first annotation, to include additional coordination code not present in the obtained source code, and the first compiler specific to the first-type subset of the target CPUs. The method further includes generating from the second source code portion a second source code stream to be supplied for compilation by a second compiler, the second compiler specific to a second-type subset of the target CPUs. The target CPUs of the first- and second-type subsets have one or more different functionalities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIGNALOGIC INC9617 WENDELL ROAD DALLAS TX 75044

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brower, Jeffrey H Dallas, US 6 79
Johnson, Christopher K Frisco, US 2 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00