Pretreatment of biomass using thermo mechanical methods before gasification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9126173
APP PUB NO 20130248767A1
SERIAL NO

13429847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated plant generates syngas from biomass, where the integrated plant includes a Thermo Mechanical Pulping (TMP) process, a biomass gasifier, a methanol synthesis process, and a liquid fuel generation process. Biomass is received as a feedstock in the TMP process. The biomass is pre-treated in the TMP process for subsequent supply to the biomass gasifier by using a combination of heat, pressure, moisture, and mechanical agitation that are applied to the biomass to make the biomass into a pulp form. The TMP process breaks down a bulk structure of the received biomass, at least in part, by applying steam to degrade bonds between lignin and hemi-cellulose from cellulose fibers of the biomass. Next, the broken down particles of the biomass are reacted in a biomass gasification reaction at a temperature of greater than 700 degrees C. to create syngas components, which are fed to a methanol synthesis process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNDROP IP HOLDINGS LLC10515 MOORING RD LONGMONT CO 80504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ampulski, Robert S Fairfield, US 22 1488
Kugler, Freya Conifer, US 1 14
Monteith, Joel K Bethel, US 4 220
Turner, John T West Chester, US 17 282

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00