Amplifiers with boosted or deboosted source degeneration inductance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9124228
APP PUB NO 20140300417A1
SERIAL NO

13857031

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Amplifiers with boosted or deboosted source degeneration inductance are disclosed. In an exemplary design, an apparatus includes an amplifier circuit and a feedback circuit. The amplifier circuit receives an input signal and provides an output signal and includes a source degeneration inductor. The feedback circuit is coupled between a node of the amplifier circuit and the source degeneration inductor. The feedback circuit provides feedback to vary an input impedance of an amplifier including the amplifier circuit and the feedback circuit. The feedback circuit may be programmable and may be enabled to provide feedback or disabled to provide no feedback. Alternatively, the feedback circuit may always be enabled to provide feedback. In either case, the feedback circuit may have a variable gain to provide a variable input impedance for the amplifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Li-Chung Irvine, US 51 1029
Xu, Rui San Diego, US 425 2031

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00