Power generating circuit and switching circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9124224
APP PUB NO 20120319773A1
SERIAL NO

13523793

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a power generating circuit including a first transistor in which a second control signal is applied to a control terminal and a first control signal is applied to one end, and which has the other end connected to an output terminal, a second transistor in which the first control signal is applied to a control terminal and the second control signal is applied to one end, and which has the other end connected to the output terminal a third transistor in which one of the first and the second control signals is applied to a control terminal and which has one end grounded, and a fourth transistor in which the other one thereof is applied to a control terminal and which has one end connected to the other end of the third transistor and the other end connected to the output terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO
KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGYDAEJEON DAEJEON

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Dong Hyun Seoul, KR 10 40
Kim, Yu Sin Gyeonggi-do, KR 29 231
Park, Sung Hwan Gyeonggi-do, KR 66 368
Yun, Sun Woo Seoul, KR 62 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00