Systems and methods of smooth light load operation in a DC/DC converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9124177
APP PUB NO 20120038331A1
SERIAL NO

12854097

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and devices for smooth light load operation in a DC/DC converter are presented. The disclosed systems and methods enable smooth discontinuous conduction mode (DCM)/continuous conduction mode (CCM) transition. The disclosed systems and methods of smooth light load operation in a DC/DC converter may also avoid the generation of sub-harmonics during light load operation. In an example embodiment, a rising ramp is used to control the ON time of the converter oscillator, while a falling ramp controls the OFF time. During DCM operation, the minimum value of the falling ramp is clamped. The clamping of the falling ramp ensures a substantially similar level of the error amplifier output in both CCM and DCM and avoids disturbances caused by a difference in the error amplifier outputs between the modes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD M/S 3999 DALLAS TX 75243

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hal Jersey City, US 6 39
Li, Xuening Cary, US 22 380
Wu, Wenkai East Greenwich, US 80 794
Zhu, Weidong East Lyme, US 42 174

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00