Voltage converter comprising a storage inductor with one winding and a storage inductor with two windings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9124176
APP PUB NO 20130249515A1
SERIAL NO

13892475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuitry includes first, second, and third switching elements, first and second storage inductors, two connector pairs, and first and second intermediate potential points. The second storage inductor includes first and second windings. The first intermediate potential point is connected to a first connector of the first connector pair via the first storage inductor, to the second connector of the first connector pair via the third switching element, and to the second intermediate potential point. The second intermediate potential point is connected to the first connector of the second connector pair via a series connection of the first switching element and the first winding of the second storage inductor, and to the second connector of the second connector pair via a series connection of the second switching element and the second winding of the second storage inductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MÜLLER BURKARDCHRISTOPHSTRASSE 19 34123 KASSEL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mueller, Burkard Kassel, DE 17 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00