LDO/HDO architecture using supplementary current source to improve effective system bandwidth

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9122292
APP PUB NO 20140159682A1
SERIAL NO

13750794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An LDO/HDO circuit adds a supplementary current source to supply the output node. The current boosting section includes a digital comparator with a first input connected to the LDO's feedback loop and a second input connected to a reference level. The comparator then generates a digital output used to control the supplementary current source. This approach also can be used in a far-side implementation, where the local supply level for the load is boosted by the current source based a comparison of this local level and the output of the LDO. Miller capacitive compensation is also considered. Current in shunted to ground from a node in the Miller loop, where the level is controlled by the output of a digital comparator base on a comparison of the circuit's output voltage and a reference level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANDISK TECHNOLOGIES INC951 SANDISK DRIVE LEGAL DEP MILPITAS CA 95035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Feng Fremont, US 283 3799
Wang, Sung-En San Jose, US 22 139
Yin, Jiang San Jose, US 13 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00