Optical film and display device having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9121999
APP PUB NO 20150036080A1
SERIAL NO

13953871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical film and a display device having the same are provided. The optical film has a light input face, a light output face opposite to the light input face, and a light-output structure disposed on the light output face. The light-output structure includes a plurality of light output microstructures such as prisms disposed side by side along a first direction on the light output face. Each prism has a first quadrilateral cross section parallel to the first direction. A first side of the quadrilateral cross section is connected to the light output face and includes a first angle with the light output face, wherein the first angles of the prisms continuously arranged have angle values varying in a periodic manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF CENTRAL FLORIDA RESEARCH FOUNDATION INC12201 RESEARCH PARKWAY SUITE 501 ORLANDO FL 32826
AU OPTRONICS CORPORATIONNO 1 LI-HSIN RD II SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Hui-Chuan Orlando, US 72 2746
Lan, Yi-Fen Hsin-Chu, TW 19 47
Tsai, Cheng-Yeh Hsin-Chu, TW 40 173
Wu, Shin-Tson Oviedo, US 125 1649
Xu, Da-Ming Orlando, US 1 15
Yan, Jin Orlando, US 94 255

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00