Door opener for closed-circuit current operation and open-circuit current operation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9121198
APP PUB NO 20120193927A1
SERIAL NO

13358608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A door opener for closed and open circuit current operation has a door opener latch, switchover means mounted to move in a first rotary bearing for blocking and releasing the latch, armature adjustable about a second rotary bearing for blocking or releasing the switchover means, electromagnet for adjusting the armature, and restoring spring moving the armature to an inoperative position when the electromagnet is in the unenergized state. The switchover means has a blocking cross section facing the armature, and an adjacent release cross section recessed behind the blocking cross section. The armature has a plate-like design and a blocking recess in the central section merging with a slot-like release recess in the end section averted from the second bearing, the blocking cross section corresponding to the blocking recess and the release cross section corresponding to the release recess. The vertical distance between the first and second bearings is variable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASSA ABLOY SICHERHEITSTECHNIK GMBH72458 ALBSTADT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gresser, Dieter Meβstetten, DE 1 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00