Dielectric layer for electrostatic chuck and electrostatic chuck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9120704
APP PUB NO 20140103612A1
SERIAL NO

14054417

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dielectric layer for an electrostatic chuck is formed of a ceramic material having a first phase including aluminum oxide and a second phase including composite carbonitride (Ti, Me)(C, N) that contains titanium as fine grains. The Me represents a transition element and metals of Group 4 to Group 6 such as Mo and W. The ceramic material that includes the second phase by 0.05 vol % to 2.5 vol % has a volume resistivity value of about 108 to 1013 (Ω·cm) necessary for a Johnsen-Rahbek type electrostatic chuck.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHINKO ELECTRIC INDUSTRIES CO LTDNAGANO-SHI
JAPAN FINE CERAMICS CENTERNAGOYA-SHI AICHI 456-8587
NIPPON TUNGSTEN CO LTD460 AZA SANNOH OHAZA SHIOBARU MINAMI-KU FUKUOKA CITY FUKUOKA PREFECTURE
TREK HOLDING CO LTD1-2-6 NIHONBASHI CHUO-KU TOKYO 103-0027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsubara, Hideaki Aichi, JP 17 127
Matsuda, Tetsushi Aichi, JP 4 2
Nagano, Mitsuyoshi Fukuoka, JP 11 100
Saito, Miki Nagano, JP 6 29
Shiraiwa, Norio Nagano, JP 16 78
Tamagawa, Koki Nagano, JP 14 950
Tsutsumi, Kouta Fukuoka, JP 2 6
Uehara, Toshio Tokyo, JP 15 121
Yoshikawa, Tadayoshi Nagano, JP 9 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00