Modified zeolite catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9120090
APP PUB NO 20120178615A1
SERIAL NO

13377725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modified zeolite catalyst derived from a zeolite of a structural type which consists of a one-dimensional micropore structure of channels made from rings containing between 8 and 12 silicon/aluminum atoms is disclosed. It consists substantially of a plurality of crystallites having additional mesoporosity whose volume is in the range 0.09 to 0.25 cc/g as mentioned by nitrogen adsorption at 77° K and calculated by the BJH method. The mesoporosity may be introduced into the crystallites by e.g. treatment with aqueous sodium hydroxide at a pH at 25° C. in excess of 8 for an extended period at elevated temperature. The catalyst shows improved resistance to catalyst deactivation and greater selectivity to higher hydrocarbons when used to e.g. oligomerize light alkenes e.g. propene or the butenes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BP OIL INTERNATIONAL LIMITED1 FINSBURY CIRCUS LONDON EC2M 7BA
BP CORPORATION NORTH AMERCIA INC501 WESTLAKE PARK BOULEVARD HOUSTON TX 77079

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corma, Avelino Valencia, ES 42 381
Doskocil, Eric J Oswego, US 3 16
Martinez, Cristina Valencia, ES 3 16
Yaluris, George Park Ridge, US 26 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00