Method for manufacturing junction box, junction box, and cut switch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9118169
APP PUB NO 20130229752A1
SERIAL NO

13710806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method for manufacturing a junction box, a first cut switch or a second cut switch is selectively provided to a main body. The first cut switch is capable of connecting and breaking a connection between a first power input circuit and a first output circuit, and connecting and breaking a connection between a second power input circuit and a second output circuit. The second cut switch is capable of connecting and breaking a connection between the first power input circuit and the first and second output circuits. The main body includes the first power input circuit; the first output circuit disconnected from the first power input circuit and having at least one of a first electrical device connected thereto; the second power input circuit; and the second output circuit disconnected from the second power input circuit and having at least one of a second electrical device connected thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO WIRING SYSTEMS LTD1-14 NISHISUEHIRO-CHO YOKKAICHI-SHI MIE 5108503

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Yuten Mie, JP 4 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00