Nitride semiconductor substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9117743
APP PUB NO 20140339679A1
SERIAL NO

14271521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nitride semiconductor substrate suitable for a high withstand voltage power device is provided in which current collapse is controlled, while reducing leakage current. In a nitride semiconductor substrate, wherein a buffer layer, an active layer, and an electron supply layer, each comprising a group 13 nitride, are stacked one by one on a silicon single crystal substrate, the buffer layer has a structure where a multilayer stack in which a pair of nitride layers having different concentrations of Al or Ga are repeatedly deposited a plurality of times on an initial layer of AlxGa1−xN (0≦x≦1) is stacked, and includes a doping layer whose carbon concentration is 1×1018 to 1×1021 cm−3 and whose Si concentration is 1×1017 to 1×1020 cm−3, a thickness of the doping layer is 15% or more of the total thickness of the buffer layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COORSTEK GK11-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 1410032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Komiyama, Jun Hadano, JP 79 1798
Oishi, Hiroshi Hadano, JP 82 922
Yoshida, Akira Tokyo, JP 184 1977

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00