Course self-correcting projectile

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9115968
SERIAL NO

14178968

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A new fuze that reduces projectile miss-distance to a target, by correcting for discrepancies in anticipated round velocities through its flight. As a result, the fuze-equipped projectile is nominally aimed at a target and maintains improved accuracy relative to a conventional round. The fuze adjusts for the discrepancies in velocity by using an internal electric motor to mechanically actuate a drag-altering surface on the fuze body. In order to adjust for errors in the anticipated velocity, the fuze compares its preprogrammed velocity to its actual velocity at a given point in time during flight. An anticipated velocity table versus time in flight is constantly referenced so that appropriate adjustments in velocity can be made.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S GOVERNMENT AS REPRESENTED BY THE SECRETARY OF THE ARMYU S ARMY CCDC-AC LEGAL OFFICE BLDG 3 PICATINNY ARSENAL DOVER NJ 07806-5000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abruzzo, Benjamin Newark, US 1 8
DeVenezia, Jason Newton, US 1 8
Marshall, Eric Wyckoff, US 2 8
Mellini, Mark Denville, US 6 18
Pica, Michael Levittown, US 2 18
Recchia, Thomas Succasunna, US 3 18
Schumer, Sean Lincoln Park, US 4 13
Thomas, John Morris Plains, US 83 1173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00