Rich-lean combustion burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9115891
APP PUB NO 20120156629A1
SERIAL NO

13328673

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A row of rich-side flame holes is centrally arranged. Two rows of lean-side flame holes are arranged on both sides of the rich-side flame hole row, respectively. In addition, two rows of rich-side flame holes are arranged on the outsides of the two lean-side flame hole rows, respectively. A lower end part of a central rich-side burner part is projected into a tubular part into which the rich-side mixture is introduced, and communication holes in fluid communication with an inner space are formed in walls on both sides so as to pass completely therethrough in alignment with each other. Each communication hole has a larger diameter than an inner width P and is disposed at a potion situated nearer to the upper of the tubular part and nearer to the front so as to leave, at the rear, a space in which dust p particles are accumulated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORITZ CORPORATION93 EDOMACHI CHUO-KU KOBE-SHI HYOGO 650-0033

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyama, Takashi Hyogo, JP 186 1988
Kuriyama, Yasutaka Hyogo, JP 16 198
Nagai, Itsuo Hyogo, JP 16 345
Umakoshi, Ryosuke Hyogo, JP 12 158
Wada, Norihide Hyogo, JP 27 201
Wakada, Takeshi Hyogo, JP 8 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00