Inverter module and integrated-inverter electric compressor using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9115707
APP PUB NO 20110261588A1
SERIAL NO

13139906

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inverter module and an integrated-inverter electric compressor using the same, which can eliminate noise interference, noise leakage, and the like attributable to a smoothing capacitor accommodated therein and which can be reduced in size and weight is provided. An inverter module (11) includes a resin module case (17); a power system board (15) provided on a bottom side of the module case (17); and a control board (19) provided on an upper side of the module case (17). A smoothing capacitor (18) connected to a power supply line for the power system board (15) is incorporated into the module case (17), and the smoothing capacitor (18) is electromagnetically shielded with respect to the power system board (15) and the control board (19).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-8332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arita, Mitsuaki Aichi, JP 1 16
Fujita, Masashi Aichi, JP 80 561
Hattori, Makoto Tokyo, JP 146 1232
Nakagami, Takashi Tokyo, JP 50 522
Sato, Hidetaka Tokyo, JP 38 333
Teshima, Kazunori Tokyo, JP 4 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00