Internal combustion engine with a first and a second injecter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9115640
APP PUB NO 20150101565A1
SERIAL NO

14574484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine includes a first injector and a second injector for injecting fuel directly into a combustion chamber in a cylinder in a crank case of the internal combustion engine. The combustion chamber is delimited at one side by a piston which is arranged in the cylinder so as to carry out a stroke and at the other side by a cylinder head. At least one gas exchange inlet valve and a gas exchange outlet valve are provided in the cylinder head for a charge exchange. The first injector is largely oriented in the direction of a cylinder axis, and the second injector is oriented at an angle to the cylinder axis. Maximally 80% of a full-load fuel quantity required by the internal combustion engine for a full load can be introduced into the cylinder using the first injector and maximally 50% using the second injector. The injectors can be configured for smaller fuel flow rates using the internal combustion engine design and operating method, whereby the precision of the injection is improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFTMUNICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gutzer, Ulrich Munich, DE 10 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00