System and method for hydrocarbon production forecasting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9115566
APP PUB NO 20120330634A1
SERIAL NO

13534025

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for hydrocarbon production forecasting which includes creating an integrated production model representative of at least two interconnected subsurface tanks, at least one well, and a surface network, wherein the surface network comprises multiple components including at least one pipeline; parameterizing a subsurface part of the integrated production model by using material balance to characterize the at least two interconnected subsurface tanks; parameterizing a well part of the integrated production model based in part on well geometry; parameterizing the surface network based on the multiple components of the surface network; combining the parameterized subsurface part, the parameterized well part and the parameterized surface network into an improved integrated production model; forecasting hydrocarbon production based on the improved integrated production model and displaying the input, output and intermediary products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEVRON U S A INCP O BOX 6006 SAN RAMON CA 94583-0806

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amudo, Chidi Perth, AU 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00