Collision detection and mitigation systems and methods for a shovel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9115482
APP PUB NO 20140316665A1
SERIAL NO

14321530

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for detecting collisions. One system includes a processor configured to receive data from at least one sensor installed on a shovel, identify a plurality of planes based on the data, determine if the plurality of planes are positioned in a predetermined configuration associated with a haul truck to identify whether the plurality of planes represent a haul truck. The processor is further configured to receive a current position and a current direction of movement of a dipper of the shovel, and determine if a collision is possible between the dipper and the identified haul truck based on the plurality of planes, the current position, and the current direction of movement and without receiving any information from the haul truck. If a collision is possible, the processor is configured to alert an operator of the shovel and, optionally, augment movement of the dipper.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOY GLOBAL SURFACE MINING INC4400 W NATIONAL AVENUE MILWAUKEE WI 53214

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Flees, Mark M Brookfield, US 3 52
Gupta, Kamal Kishore Milwaukee, US 3 52
Hargrave,, Jr Brian K Mequon, US 4 56
Koxlien, Steven Waukesha, US 3 55
Munoz, Ryan A Glendale, US 4 56
Reiland, Matthew J Mequon, US 18 1499
Taylor, Wesley P Glendale, US 34 356

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00