Trolley dumper apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9114941
SERIAL NO

13790787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus includes an elevated structure extending along and above a receptacle, a trolley for travel along the elevated structure, a trolley bucket supported by the trolley for receiving and discharging unconsolidated material, and a high-lift structure including a rotatable dumper lift for lifting unconsolidated material from a first elevation to a second elevation greater than the first elevation, and discharging unconsolidated material into the trolley bucket. The high-lift structure is operably coupled with the elevated structure. The rotatable dumper lift can receive a first volume of unconsolidated material at the first elevation, lift the first volume from the first elevation to the second elevation, and discharge the first volume into the trolley bucket. The trolley bucket can discharge the first volume of unconsolidated material into the receptacle while the rotatable dumper lift receives a second volume of unconsolidated material at the first elevation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEBRIGHT PRODUCTS INC127 WATER ST HOPKINS MI 49328

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brisbin, William Dale Hopkins, US 2 1
Fein, Patrick Dorr, US 2 1
Scobey, James Hopkins, US 2 3
Sebright, Brent H Hopkins, US 13 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00