Apparatus and method for controlling a locomotive consist having a locomotive and auxiliary power unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9114812
SERIAL NO

13841198

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and method for controlling a locomotive assembly having a locomotive and an auxiliary power unit is disclosed. The locomotive assembly includes at least one locomotive having a power bus, a primary engine-generator set electrically coupled to the power bus, and a locomotive controller programmed to control the primary engine-generator set. The locomotive assembly also includes an auxiliary power unit having an auxiliary engine-generator set electrically coupled to a locomotive power bus, and a first auxiliary controller. The auxiliary controller is programmed to receive a command signal from the locomotive controller indicating a desired amount of power, and control the auxiliary engine-generator set of the auxiliary power unit to produce the desired amount of power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOO LINE RAILROAD COMPANY120 SOUTH SIXTH STREET SUITE 1000 MINNEAPOLIS MN 55402

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frazier, Scott Raymond Morrison, US 20 171
Ginter, Karl Beltsville, US 76 2749
Pritchard, Jeffrey Orion Oakland, US 46 668
Pykkonen, Kevin Boulder, US 10 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00