Hybrid electric turf mower with power shed and power boost

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9113596
APP PUB NO 20140283492A1
SERIAL NO

14215712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turf mower has one or more electrically powered cutting units and a traction drive system that is operatively powered by an internal combustion engine. A motor generator is also powered by the engine and is operatively connected to the engine and the traction drive system. A battery pack stores electrical energy and is charged by the motor generator during normal mowing on flat ground. When mowing on hillsides with increased mechanical power requirements above that supplied by the horsepower of the engine, a control system first removes the load imposed by the cutting units by supplying the electrical energy to the cutting units from the battery pack instead of the motor generator. If that is insufficient, the control system then uses energy from the battery pack to power the motor generator as a motor to supply additional mechanical power for use by the traction drive system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE TORO COMPANY8111 LYNDALE AVENUE SOUTH MINNEAPOLIS MN 55420

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bricko, Benjamin A Faribault, US 7 52
Gaebel, James R Eden Prairie, US 3 21
Meemken, Kelly S St. Paul, US 7 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00