Multilayer electronic component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9111690
APP PUB NO 20100091426A1
SERIAL NO

12543549

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is used to manufacture a multilayer electronic component including a multilayer composite including internal electrodes having ends that are exposed at a predetermined surface of the multilayer composite. In the method, the exposed ends of the internal electrodes are coated with a metal film primarily composed of at least one metal selected from the group consisting of Pd, Au, Pt and Ag and having a thickness of at least about 0.1 μm by immersing the multilayer composite in a liquid containing a metal ion or a metal complex. Then, a continuous plating layer is formed by depositing a plating metal on the ends of the internal electrodes exposed at the predetermined surface of the multilayer composite, and subsequently growing the deposits of the plating metal so as to be connected to each other. Thus, exposed ends of the internal electrodes are electrically connected to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDKYOTO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwanaga, Toshiyuki Sabae, JP 23 254
Kayatani, Takayuki Echizen, JP 14 161
Motoki, Akihiro Fukui, JP 90 1209
Ogawa, Makoto Fukui, JP 156 1866
Yoshida, Akihiro Echizen, JP 123 1137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00