Thermal insulation composite system, building comprising such a system and method for producing a thermal insulation composite system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9109367
APP PUB NO 20140202104A1
SERIAL NO

14238435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a thermal insulation composite system, comprising a plurality of panel-shaped thermal insulating bodies and a plurality of fixing devices for fixing the thermal insulating bodies to an external wall of a building, wherein each of the fixing devices contains a fixing plate for fixing the fixing device to the outer wall, a connecting bridge mounted on the surface side of the fixing plate, and an insert plate that is fixed to the fixing plate via the connecting bridge in a plane substantially parallel to the fixing plate. At least a first portion of the insert plate is designed for relative engagement in the first slot of at least a first of the thermal insulation bodies. The connecting bridge is designed for complete relative engagement in a second slot of the at least one first thermal insulation body, said second slot corresponding to the thickness of the connecting bridge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THESWIX INNOVATION AG6052 HERGISWIL NW

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Plozner, Fabrizio Zurich, CH 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00