Process for separation of Ca- or Mg-sulfite spent liquor to yield crystalline xylose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9109265
APP PUB NO 20110172411A1
SERIAL NO

13001267

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the separation of a xylose-containing, lignosulphonate-containing Ca-sulfite spent liquor is provided. The process comprises a first step of: (A) chromatographic separation of the Ca- or Mg-sulfite spent liquor using a single pass through a batch-type long resin bed chromatography column having a strong acid cation exchange resin as a separation medium. The ratio of the bed length:mean resin bead diameter of the column is 10,000-40,000. This step yields •a first xylose-rich fraction having a xylose content 50-70 wt. % based on dry solids and • a lignosulphonate-rich fraction. The process further comprises a step of: (B) crystallizing xylose from the first xylose rich fraction by using a crystallization method comprising (i) boiling crystallization; (ii) cooling crystallization or (iii) a combination of (i) and (ii) to obtain a first batch of crystalline xylose and a first xylose run-off. The process provides a simplification of existing methods, and at the same time allows advantages such as improved xylose yield and improved xylose purity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL N&H DENMARK APSPARALLELVEJ 16 KONGENS LYNGBY DK-2800

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heikkila, Heikki Espoo, FI 73 1782
Lewandowski, Jari Siuntio, FI 21 377

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00