Airport construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9108744
APP PUB NO 20080035791A1
SERIAL NO

11890670

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A major portion, if not the whole, of passenger facilities are located underground to reserve a virtually building-free ground level for the most efficient movements of aircraft. A number of pairs of parked positions of aircraft for loading/unloading are arranged in each of a number of rows. Adjacent aircraft face in opposite directions to facilitate loading/unloading from and to a pair of passenger gates located below each pair of such parked positions and to also facilitate forward movement of aircraft to and from such parked positions. The resulting arrangement is compact and allows efficient movement of aircraft to and from runways while also minimizing the distances passengers travel in moving from a terminal to gates and in moving from one gate to another. Loading/unloading ramps are moveable between inactive positions out of the paths of aircraft and active positions for loading and unloading. Two such ramps can be provided for fore and aft loading of one aircraft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAKEUCHI ARTHUR SCHICAGO IL 60637-1830

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takeuchi, Arthur S Chicago, US 3 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00