Systems and methods for switch-controlled VAR sources coupled to a power grid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9104184
APP PUB NO 20130138260A1
SERIAL NO

13707560

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for switch-controlled VAR sources coupled to a power grid are described. In some embodiments, a system comprises a distribution power network coupled to a first switch-controlled VAR source. The first switch-controlled VAR source may comprise a processor, a voltage compensation component, and a switch. The first switch-controlled VAR source may be configured to obtain a first delay value, monitor a first proximate voltage, initiate a first delay duration based on the comparison of the first proximate voltage to at least one set point, the first delay duration being based on the first delay value, determine, with the processor, after the first delay duration, whether to connect the voltage compensation component based on the monitored voltage, and control, based on the determination, the switch to connect the voltage compensation component to adjust a network voltage or a network voltage component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SENTIENT ENERGY TECHNOLOGY LLC4111 EAST 37TH STREET NORTH WICHITA KS 67220

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hao San Jose, US 1012 6150
Divan, Deepakraj M San Jose, US 69 2957
Prasai, Anish San Jose, US 29 439

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00