Large-scale hydraulic variable-speed floating box flap valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9103452
APP PUB NO 20130292589A1
SERIAL NO

13822082

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A large-scale hydraulic variable-speed floating box flap valve includes a hinge support, a valve seat, an upper valve leaf and a lower valve leaf, the valve seat and the hinge support are both fixed on a pump station base. The upper valve leaf is hinge-connected to the hinge support through a pin shaft, and the lower valve leaf is hinge-connected to the upper valve leaf. The upper valve leaf and the lower valve leaf may contact and match the valve seat in a sealed manner through a sealing structure. The upper valve leaf is connected to the lower valve leaf through at least one hydraulic mechanism. The hydraulic mechanism has one end hinge-connected to the upper valve leaf, and the other end hinge-connected to the lower valve leaf. The impact force between the valve leaves and the valve seat is damped by the hydraulic mechanism.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NINGBO JUSHEN PUMPS INDUSTRY CO LTDHEHUAQIAO INDUSTRY DISTRICT YUNLONG TOWN YINZHOU DISTRICT NINGBO ZHEJIANG 315135

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Quanmin Zhejiang, CN 3 4
Liu, Rungen Zhejiang, CN 1 1
Teng, Kangle Zhejiang, CN 2 3
Xiong, Dongliang Zhejiang, CN 1 1
Ying, Jianguo Zhejiang, CN 3 4
Zhai, Songmao Zhejiang, CN 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00