Engineered Portland cement incorporating SCMs and methods for making same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9102567
SERIAL NO

13906201

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Engineered cements are described that include an engineered clinker fraction designed for use with one or more supplementary cementitious material (“SCM”) fractions. The engineered clinker fraction has a narrow particle size distribution (“PSD”) with a relatively high tricalcium silicate (“C3S”) content as compared to traditional ordinary Portland cement (“OPC”). The high C3S content and narrow PSD provide desired reactivity and set time when combined with the one or more SCMs. The clinker fraction may be combined with one or more ultrafine SCM fractions and/or one or more coarser SCM fractions to achieve a desired wide particle size distribution. By engineering the chemistry and the particle size of the clinker fraction and the SCM fraction to work together, the engineered cements can have superior packing density, water demand, reactivity, set time, sulfate resistance, and strength development as compared to conventional OPC-SCM blends.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROMAN CEMENT LLC1475 PRINCETON AVENUE SALT LAKE CITY UT 84105

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guynn, John M Salt Lake City, US 44 547
Hansen, Andrew S Bountiful, US 54 1234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00