Process for joining aircraft structural components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9102019
APP PUB NO 20140173879A1
SERIAL NO

13725855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for joining parts together is provided by positioning and temporarily clamping parts to be joined together. A number (n) of pilot holes may then be drilled through the temporarily clamped parts (e.g., by means of Cleco fasteners), wherein the number (n) of pilot holes is less than a total number (N) of holes required to be drilled to allow the parts to be joined together by permanent fasteners and to receive temporary fasteners therein. A remaining number (η) of holes to achieve the total number (N) of holes required for the parts to be joined together by permanent fasteners may thereafter be drilled so that permanent fasteners may be installed both, by automated system, in the number (n) of pilot holes and the remaining number (η) of holes that have been drilled to thereby permanently join the parts together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMBRAER S AST JOSE DE KAMPS BRAZIL
ITA - INSTITUTO TECNOLOGICO DE AERONAUTICAPRACA MAL EDUARDO GOMES 50 SAO JOSE DOS CAMPOS 12228-900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Negroni, Daniella Yada São José dos Campos, BR 1 8
Trabasso, Luis Gonzaga São José dos Campos, BR 2 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00