Operating process for a fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9099708
APP PUB NO 20110311893A1
SERIAL NO

13152397

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system with a reformer for generating hydrogen-containing synthesis gas and a fuel cell of the fuel cell system. The fuel cell is arranged downstream of the reformer. The fuel cell system is heated up conventionally in a first heat-up phase by combusting a superstoichiometric fuel/air mixture. The first heat-up phase is stopped by stopping the combustion of the fuel/air mixture in the mixing chamber of the reformer. In a second heat-up phase, in which the reformer catalyst is operated in the catalytic combustion operation with a superstoichiometric fuel/air mixture, the entire heat-up process can be significantly shortened by a change in stoichiometry at the end of the second heat-up phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
J EBERSPAECHER GMBH & CO KGEBERSPAECHERSTRASSE 24 ESSLINGEN D-73730

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reiners, Karsten Esslingen, DE 15 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00