Method of producing superconductive oxide material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9096440
APP PUB NO 20090156411A1
SERIAL NO

12083650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a superconductive material involves the step (1) of applying a solution of an organic compound of metals and oxides of the metals forming a superconductive material, onto a support body to be subsequently dried, the provisional baking step (2) of causing organic components of the organic compound of the metals to undergo thermal decomposition, and the main baking process step (3) of causing transformation of the oxides of the metals into the superconductive material, thereby producing an epitaxially-grown superconductive coating material, wherein the support body is irradiated with the laser light during a period between the steps (1) and (2) from a surface of the support body, on the opposite side of the surface coated with the solution of the organic compound of the metals for forming the superconductive material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE JAPAN STEEL WORKS LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ebisawa, Takashi Yokohama, JP 28 154
Koyanagi, Kunihiko Yokohama, JP 3 44
Kumagai, Toshiya Tsukuba, JP 20 117
Ohtu, Hidehiko Yokohama, JP 2 3
Sohma, Mitsugu Tsukuba, JP 5 46
Tsuchiya, Tetsuo Tsukuba, JP 31 206
Tsukada, Kenichi Tsukuba, JP 51 217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00