System for producing fiber-reinforced molded parts and method for operating a system for producing fiber-reinforced molded parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9096023
APP PUB NO 20120273989A1
SERIAL NO

13509587

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for the continuous production of fiber-reinforced resin sheets during the production of fiber-reinforced molded parts by extrusion in a molding press, wherein a production device for producing resin sheets, comprising a mixing device for combining at least one resin base having fibers and a fulling and saturating device for mixing the fibers with the resin base into a resin sheet is arranged in succession, a thickening device is arranged for maturation of the resin sheet and a transfer device is arranged for cutting the resin sheet to length to a cut sheet for subsequent transfer of at least one cut sheet to the molding press; in the thickening device there is a transport section between the inlet point of the resin sheet into and an outlet point of the resin sheet out of the thickening device. At least one positioning device is arranged substantially within the thickening device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIEFFENBACHER GMBH MASCHINEN- UND ANLAGENBAU75031 EPPINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graf, Matthias Bretten, DE 38 170

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00