Method and apparatus for controlling a hybrid power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9093862
APP PUB NO 20110273022A1
SERIAL NO

13185862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a simplified method of controlling power among the various sources and loads in a power system. Power generating sources are each connected to a common DC bus through a converter. The converter selectively transfers energy to the DC bus at a maximum rate or at a reduced rate according to the level of the DC voltage present on the DC bus. At least one storage device is preferably connected to the common DC bus through a power regulator. The power regulator selectively transfers energy to or from the DC bus as a function of DC voltage level present on the DC bus. Further, an inverter may be provided to bidirectionally convert between the DC voltage and an AC voltage for connection to a customer load or the utility grid. Each power conversion device is independently controlled to provide a modular and simplified power control system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FAITH TECHNOLOGIES INC201 MAIN ST PO BOX 260 MENASHA WI 54952

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dennis, Kevin Waukesha, US 16 254
Raasch, Michael New Berlin, US 9 301
Vang, Der Menomonee Falls, US 2 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00