Structured-core laminate panels and methods of forming the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9091066
APP PUB NO 20140013691A1
SERIAL NO

14028719

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structured-core laminate panel can be made in an efficient, structurally sound manner without the use of adhesives (film or liquid forms) using materials with different melt or glass transition temperatures. In one implementation, a manufacturer positions one or more resin substrates about a structured core, which comprises a relatively high melt or glass transition temperature compared with that of the one or more resin substrates. The manufacturer heats the assembly to at least the glass transition temperature of the resin substrates, but not to the melt or glass transition temperature of the structured core. This allows the one or more resin substrates to melt and bond (mechanically, chemically, or both) to the structured core on one side (or inner surface), while maintaining a substantially planar or original conformation on an opposing side (or outer surface).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3FORM LLC2300 SOUTH 2300 WEST SALT LAKE CITY UT 84119

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brewster, M Hoyt Salt Lake City, US 10 116
Moore, Charles H Salt Lake City, US 75 789
Willham, John E C Sandy, US 22 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00