Fabrication of natural cellulose fiber with flame-retarding capability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9090997
APP PUB NO 20130228949A1
SERIAL NO

13411775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fabrication of natural cellulose fiber with flame-retarding capability comprises following steps. Blend pulp and solvent of N-methylmorpholine N-oxide (NMMO) to form slurry. Evaporate extra water content from slurry by a Thin Film Evaporator (TFE) to form dope. By Dry-Jet Wet Spinning, spin and extrude dope for coagulating and regenerating. Water-rinse and dry to form natural cellulose fiber. Soaking roll natural cellulose fiber by flame retardant of N-(hydroxymethyl)-3-(methoxy phosphorus acyl). Orderly dry, bake, neutralize, soaping clean, water rinse, baking dry, soaking rolled, alkaline clean, water rinse, dry and oil the natural cellulose fiber to produce natural cellulose fiber of flame retarding capacity. Because of cross-linking reaction for the flame retardant of N-(hydroxymethyl)-3-(methoxy phosphorus acyl) with natural cellulose fiber, the flame-retarding capability thereof meet requirements of testing standards in American ASTM D6413-1999 and ASTM D2863-1995. Moreover, the wastes thereof meet the requirements of environment protections without harm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACELON CHEMICAL AND FIBER CORPORATIONNO 94 FANJIN RD PUYAN TOWNSHIP CHANGHUA COUNTY 516 R O C

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Wen-Tung Changhua County, TW 26 108
Huang, Kun-Shan Tainan, TW 25 108
Lai, Ming-Yi Changhua County, TW 25 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00