Meltblown process for producing non-woven fabrics with flame-retarding capability from natural cellulose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9090001
APP PUB NO 20130234354A1
SERIAL NO

13414874

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Meltblown process for producing non-woven fabrics with flame-retarding capability from natural cellulose comprises following steps. Blend pulp and solvent of N-methylmorpholine N-oxide (NMMO) to form slurry. Evaporate water content from slurry by a Thin Film Evaporator to form dope. Extrude the dope off spinneret bank to form filament bundle via meltblown process. Coagulating regenerate, water rinse, hydro-entangled needle-punch and dry the filament bundle to form normal natural cellulose nonwoven. Soaking roll formed nonwoven by flame retardant of N-(hydroxymethyl)-3-(methoxy phosphorus acyl). Orderly dry, bake, neutralize, soaping clean, water rinse, baking dry, soaking roll, alkaline clean, water rinse, dry and coil the nonwoven to produce modified natural cellulose nonwoven of flame retarding capacity. Because of cross-linking reaction between foregoing flame retardant and natural cellulose nonwoven, the flame-retarding capability thereof meet requirements of testing standards in American ASTM D6413-1999 and ASTM D2863-1995. Moreover, the wastes thereof meet environmental protection requirements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIN CHIH-HSIN3F NO 5 ALY 45 LN 136 SEC 2 LIXING RD SANCHONG DIST NEW TAIPEI CITY 241

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Wen-Tung Changhua County, TW 26 108
Huang, Kun-Shan Tainan, TW 25 108
Lai, Ming-Yi Changhua County, TW 25 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00