Process for producing wooden synthetic construction material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9089990
APP PUB NO 20140027942A1
SERIAL NO

14009424

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a high utility wooden synthetic construction material, with a woodgrain appearance close to the texture of natural wood, which effectively uses waste in the form of a wood powder of plywood. A wood powder of plywood, manufactured by adding an adhesive to wood fibers or chips and pressurizing, and a thermoplastic synthetic resin are used as main raw materials. A material obtained by adding an auxiliary raw material to the main raw materials is heated and melted at 160° C. to 200° C., and then pelletized to obtain raw material pellets. The raw material pellets are loaded into an extrusion molding or an injection molding machine, without actively removing contained moisture derived from the wood powder of plywood and an adhesive component from the raw material pellets, heated and melted at 150° C. to 200° C., and extruded from the mold or injected into the mold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANDY TECHNO CO LTD16-29 NANPEIDAICHO SHIBUYA-KU TOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamite, Masayuki Tokyo, JP 15 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00