Cooled motor for a paper shredder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9088183
APP PUB NO 20140034766A1
SERIAL NO

13770233

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A paper shredder motor cooling assembly having a paper shredder motor coupled to a fan shaft, an enclosure surrounding the paper shredder motor and having selected input and selected output vents to control airflow to the paper shredder motor, a fan coupled to the fan shaft, communicating with the selected input vents or the selected output vents; when the paper shredder motor is operating, the rotor shaft turns the fan to generate a differential air pressure between the selected input vents and the selected output vents, removing heat from the motor. A duty cycle of greater than 15 minutes is obtained. The fan can be coupled to the motor by speed increasing gearing, attached to the cutter blade assembly, such that the fan turns faster than the motor. The fan also can be attached to the motor shaft. An input fan and an output fan can be used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AURORA OFFICE EQUIPMENT CO LTD SHANGHAI201181 SHANGHAI CITY JIADING DISTRICT MALU TOWN JIAXIN ROAD NO 388 MUNICIPAL DISTRICT SHANGHAI CITY 201181

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Kiapin Shanghai, CN 5 5
Tso, Yung Kang Shanghai, CN 21 27
Yang, Zhankai Shanghai, CN 5 5
Zhang, Bin Shanghai, CN 707 5717

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00