Thermoelectric conversion module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9087962
APP PUB NO 20140338716A1
SERIAL NO

14354232

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To improve the mass productivity of thermoelectric conversion modules. A thermoelectric conversion module 1 is equipped with a pair of substrates 11 and 12, a plurality of thermoelectric conversion elements 2, each having one end portion electrically connected to a first electrode 3 which is arranged on the substrate 11 and the other end portion electrically connected to a second electrode 4 which is arranged on the substrate 12, and a connection section 5 which electrically connects the first electrode 3 electrically connected to the thermoelectric conversion element 2 to the second electrode 4 electrically connected to an adjacent one of the thermoelectric conversion elements 2. The connection section 5 is separate from at least one of the first electrode 3 and the second electrode 4.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON THERMOSTAT CO LTD59-2 NAKAZATO 6-CHOME KIYOSE-SHI TOKYO 204-0003
TOKYO UNIVERSITY OF SCIENCE EDUCATIONAL FOUNDATION ADMINISTRATIVE ORGANIZATIONSHINJUKU-KU TOKYO 162-8601

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakajima, Tadao Tokyo, JP 8 106
Nemoto, Takashi Tokyo, JP 38 281
Sato, Junichi Tokyo, JP 316 3631

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00