High efficiency photovoltaic cell and manufacturing method free of metal disulfide barrier material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9087943
APP PUB NO 20090320920A1
SERIAL NO

12479409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming a thin film photovoltaic device includes providing a transparent substrate comprising a surface region and forming a first electrode layer overlying the surface region. Additionally, the method includes forming a copper indium material comprising an atomic ratio of Cu:In ranging from about 1.35:1 to about 1.60:1 by at least sputtering a target comprising an indium copper material. The method further includes subjecting the copper indium material to thermal treatment process in an environment containing a sulfur bearing species. Furthermore, the method includes forming a copper indium disulfide material from at least the thermal treatment process of the copper indium material and maintaining an interface region between the copper indium disulfide material and electrode substantially free from a metal disulfide layer, which has different semiconductor characteristics from the copper indium disulfide material. Moreover, the method includes forming a window layer overlying the copper indium disulfide material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STION CORPORATION6321 SAN IGNACIO AVENUE SAN JOSE CA 95119

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Howard W H Saratoga, US 49 599

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00