Power supply system with power factor correction and efficient low power operation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9087656
SERIAL NO

13526165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for efficiently converting power from an AC line is disclosed. The power converter supplies power to the load, performing power factor correction at nominal and high loads, i.e. above a predetermined output power threshold, and operating in an on-demand burst mode synchronized to the AC line at low loads, i.e. below a predetermined output power threshold. The duration of an operating interval during which power conversion takes place may be reduced and varied at low loads as a function of the output power demands to increase overall conversion efficiency. The operating interval may be centered about a peak in the input voltage waveshape for operating intervals that are less than a full rectification period. For operating intervals that are less than a full rectification period a modified power factor correction may be used, in which the input current waveshape approximates the input voltage waveshape during the operating interval.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VI CHIP INC25 FRONTAGE ROAD ANDOVER MA 01810

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vinciarelli, Patrizio Boston, US 231 6307

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00