Examination system for electric vehicle or hybrid electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9086333
APP PUB NO 20120323417A1
SERIAL NO

13162544

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is able to perform an examination of a motor mounted on EV or HEV (HV) as well as charge and discharge of a battery mounted on EV or HEV (HV), by a single system. The system includes a dynamometer coupled to an output shaft of a motor, a power supply unit for supplying power to the motor or the dynamometer, a motor examination circuit for supplying the power of the power supply unit to the dynamometer and the motor, a battery charge and discharge circuit connected with a battery, for supplying the power of the power supply unit to the battery or discharging the power of the battery, and a circuit switching mechanism for switching between the motor examination circuit and the battery charge and discharge circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HORIBA LTD2 MIYANOHIGASHICHO KISSHOIN MINAMI-KU KYOTO-SHI KYOTO 6018510 ?6018510
HORIBA INSTRUMENTS INCORPORATED9755 RESEARCH DRIVE IRVINE CA 92618

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Komada, Mineyuki Kyoto, JP 11 41
Rumer, Richard Mount Clemens, US 1 4
Sasahara, Kazuhisa Kyoto, JP 5 8
Witter, Steve Ann Arbor, US 1 4
Yao, Masahiro Kyoto, JP 14 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00