Methods for forming optoelectronic devices including heterojunction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9082919
APP PUB NO 20120252159A1
SERIAL NO

13451439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments generally relate to optoelectronic semiconductor devices such as photovoltaic cells. In one aspect, a method for forming a device includes forming an absorber layer made of gallium arsenide (GaAs) and having one type of doping, and forming an emitter layer made of a different material and having a higher bandgap than the absorber layer. An intermediate layer can be formed between emitter and absorber layers. A heterojunction and p-n junction are formed between the emitter layer and the absorber layer, where the p-n junction is formed at least partially within the different material at a location offset from the heterojunction. A majority of the absorber layer can be outside of a depletion region formed by the p-n junction. The p-n junction causes a voltage to be generated in the cell in response to the cell being exposed to light at a front side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ALTA DEVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kayes, Brendan M San Francisco, US 39 297
Kizilyalli, Isik C San Francisco, US 145 1919
Nie, Hui Cupertino, US 97 729

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00