Modal assurance criterion for comparing two mode shapes of a multi-component structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9081915
APP PUB NO 20130030771A1
SERIAL NO

13546038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved Modal Assurance Criterion for comparing two mode shapes obtained from modal analysis of a multi-component structure is disclosed. In one embodiment, a first mode shape vector and second mode shape vector for a first mode shape and second mode shape of the multi-component structure, respectively, are formed by grouping modal displacement at each node associated with each component in the multi-component structure. Further, modal assurance criterion (MAC) between the first mode shape vector and second mode shape vector is computed by dividing a square of sum of magnitudes of correlation of the modal displacement at each component for the first mode shape vector and second mode shape vector in the multi-component structure with a product of squared magnitudes of the first mode shape vector and second mode shape vector. Furthermore, the first mode shape and second mode shape of the multi-component structure are compared using the MAC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS GROUP INDIA PRIVATE LIMITEDKARNATAKA BANGALORE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joseph, Ashith Paulson Kunnel Bangalore, IN 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00