Method for controlling a short-term increase in power of a steam turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9080465
APP PUB NO 20130186091A1
SERIAL NO

13877743

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for controlling a short-term increase in power in a steam turbine including a fossil-fired steam generator having a flow path through which a flow medium flows. The method involves tapping off the flow medium from the flow path in a pressure stage and injecting it into the flow path on the flow-medium side upstream of a super heater heating surface of the respective pressure stage. A first characteristic value is used as a controlled variable for the amount of injected flow medium. The first characteristic value is characteristic of the deviation between the outlet temperature of a final super heater heating surface of the respective pressure stage on the flow medium side and a predetermined nominal temperature value. The nominal temperature value is reduced and, for the duration of the reduction in the nominal temperature value, the characteristic value is temporarily increased over-proportionately to the deviation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MUNICH 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Effert, Martin Erlangen, DE 23 49
Thomas, Frank Erlangen, DE 48 428

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00