Cart and drawer assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9079596
APP PUB NO 20140300260A1
SERIAL NO

14245575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cart and drawer assembly (20, 120) comprising a pair of panels (22) each having an inner surface (26) disposed in spaced and parallel relationship with one another with said inner surfaces (26) facing each other. Each of the panels (22) defines a pair of beams (32). At least one shelf (66, 166) is disposed between the panels (22) in perpendicular relationship to the panels (22). A plurality of ribs (122) extend from the beams (32) and are spaced from one another along the beams (32). A pair of ears (124, 224) extend from each of the shelves (66, 166) and engage an adjacent pair of the ribs (122) to maintain the panels (22) in spaced and parallel relationship with one another and perpendicular to the shelf (66, 166). Each of the beams (32) define a plurality of sockets (34) spaced from one another. A pair of plugs (76) extend from each of the mounting sides (67, 167) in one of the sockets (34) connecting the shelves (66, 166) to the panels (22). The ears (124, 224) are disposed between said plugs (76).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HMS MFG CO1230 E BIG BEAVER ROAD TROY MI 48083

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lajewski, Todd Lapeer, US 4 14
Sofy, Janet M Troy, US 44 602
Solomon, Robert Todd Ray, US 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00