Conversion control circuit and converter thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9078319
APP PUB NO 20130187566A1
SERIAL NO

13543881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conversion control circuit for controlling the operation of a power transistor is disclosed. The conversion control circuit includes a voltage-regulating switch and a control unit. One end of the voltage-regulating switch connects to an external voltage input terminal while another end connects to a voltage-regulating capacitor. The conversion control circuit converts an input voltage inputted from the external voltage input terminal into a power voltage. The power voltage is for supplying operating power to the conversion control circuit. The control unit receives a feedback voltage signal to generate a voltage-regulating pulse signal and a turn-on pulse signal, which are used for controlling the operations of the voltage-regulating switch and the power transistor, respectively and for defining a charging period for charging the voltage-regulating capacitor. A converter including the described conversion control circuit is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKO SEMICONDUCTOR CO LTD12F NO 368 GONGJIAN RD XIZHI DIST NEW TAIPEI CITY 221

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Ta-Ching Taipei, TW 17 316

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00