Method of manufacturing solid-liquid-mixed material and application thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9074054
APP PUB NO 20120052285A1
SERIAL NO

13125792

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a solid-liquid composite material, a manufacturing method and an application of the same. Liquid-phase material, solid-phase material, and solvent are distributed to form a distributed system. The solid-phase material and liquid-phase material in the solvent can be suspensions, emulsions, microemulsions, colloids, or solutions. A portion or all of the solvent is removed to produce the solid-liquid composite material. The liquid-phase material is approximately equal to 1%˜80% of the total mass of the solid-liquid composite material. The porosity of the solid-phase material is approximately equal to 10%˜80% in the solid-liquid composite material. The specific surface area of the porous material is approximately equal to 50˜2000 cm2/cm3. The field-chromatic material is added to the solid-liquid composite material to form a field-chromatic device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WUHAN UNIVERSITY430000 NO 299 BAYI ROAD WUCHANG DISTRICT WUHAN CITY HUBEI PROVINCE WUHAN CITY HUBEI PROVINCE 430000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, George Z Nottinghamshire, GB 1 2
Jin, Xianbo Wuhan, CN 3 5
Wang, Dihua Wuhan, CN 1 2
Wei, Xianjun Wuhan, CN 1 2
Yu, Linpo Wuhan, CN 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00